The current standards required by the Park Electric division are as follows:
- For an existing installation (e.g. static caravan): Satisfactory assessment by NFD’s electricians.
- For a new build: Production of an Electrical Installation (‘Dead Test’) Certificate signed off by a registered electrician.
The current regulations required by the Park Electricity division for installations are the IEE Wiring Regulations Eighteenth Edition.